Waste to Electricity

Waste to Electricity solution delivered to Xiaoshan, China

HJJ ( Hangzhou Jin Jiang Group) is one the biggest Waste to Energy companies using CFB boiler technology in China. As a part of HJJ´s boiler upgrade program the waste processing plant for the Xiaoshan power plant was completely replaced by a high capacity TYRANNOSAURUS® plant.

The Xiaoshan SRF production plant and the Hankou plant are together the first of their kind in HJJ. The plant was commissioned and taken into production in 2016.

The TYRANNOSAURUS® plant can process up to 700.000 tons of local municipal solid waste (MSW) per year and consists of two processing lines with TYRANNOSAURUS® 9904 Shredders and separation lines removing magnetic metal and heavy fraction. The SRF fuel is fed into the CFB boilers for electricity production. The TYRANNOSAURUS® plant has significantly improved the boilers’ performance concerning availability, yield and reduced emissions.

Customer: Hangzhou Jin Jiang Group, Xiaoshan, Hangzhou, China
Category: Waste to electricity plant
Waste processing capacity: 438.000 tpa
Receiving storage volume: 10600 m3
SRF storage volume: 12800 m3
Boiler feeding capacity: 20 tph / boiler (3 boilers in total)
Boiler size / Kiln capacity:
Main equipment:  

Chain-belt feeder

Drum screen

TYRANNOSAURUS® 9905 Shredder

Magnet separator

TYRANNOSAURUS® Air Classifier

Conveyors

Start-up: 2017

 

Projects

Ash handing and fuel feeding system
Bazancourt, France
Waste to Flame
Handan, China
Bioflame
New Yorkshire, England
Biomass Fuel Handling
Curtis, Spain
Waste to Electricity
Pohang, Republic of Korea